PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Aligning the stone panels at the East Elevation.jpg Installed concrete planks at the 1st floor Detention Cells Facing East.jpg Interior electrical at the 2nd floor Facing East.jpg Stone panels at the South Elevation.jpg Door frames at the 3rd floor Waiting Area 352 Facing North.jpg Installing door frames at the 3rd floor Facing South.jpg
Previous pageNext page Installed concrete planks at the 1st floor Detention Cells Facing East
Installed concrete planks at the 1st floor Detention Cells Facing East